Generator cabinet set entry time
NFPA 37 requirements dictate the clearance that a generator should have between its installation location and buildings, windows, and shrubs. For a full list, see the NFPA 37 site:. . The information contained in this document is subject to change without notice and may not be suitable for all applications. While every precaution has been taken to ensure the accuracy and completeness of this document, Vertiv assumes no responsibility and disclaims all liability for damages. . The first test case is a 100-kW diesel generator set with side door intakes and a vertical discharge. The exhaust mufler is in the discharge plenum and has an outlet at the discharge opening directing upward. The setup for this test case is shown in Figure 1. What is the proper sequence to start a generator. . small sample of the 2011 NEC rules related to generators.